Our Heat and its Various Complications

 

 

7:30 a.m.

The boiler conked out a few days after we moved in. So now I’m sitting on a heating pad while I write this because it’s 34 degrees outside but inside it feels like 20. I’m wearing many layers, and it still feels like 20 degrees.

The Skokie Valley Air Control will be here in about twenty minutes to get the heat going. The President of our Board says it should take around 3 and 1/2 more hours before we get heat. We’ll also get two radiators to replace one that’s not working and the other that simply wasn’t there.

8:20 a.m.

The men are here to install our two refurbished radiators. Meanwhile, our cat Scoutie, is hissing. The men are moving our dining room furniture while I tried to nail just one picture into our plaster walls. Seems like we’ll need to drill into the wall first.

I see the men are staring at the dining room radiator. Now I hear them discussing where to put the old radiator and how to get it out of our condo. There’s a lot of discussion going on now about how to get the radiator off the floor and where to put it.

8:50 a.m.

The old radiator is on a big dolly as they wheel it out the back door. The back door is open now and the cold air is coming in. Better turn up my heating pad.

Now the new radiator is installed. But the floorboard next and beneath it needs work.

Our New Dining Room Radiator

As I move into the living room, I see the old radiator cover is still there. I’m sure they will remove it once they get the old radiator on their trunk.

Now I’m musing why we moved in this weather. Buy this condo “talked” to us. It’s got large dark molding, wood floors, a few curved archways, two large closets and large bedrooms. So large we now need more furniture!

9:15 a.m.

The back door is now open as they bring in a new radiator. It’s a reconditioned aluminum radiator.

Now that the old radiator is out, I decided to sweep the dirt away. But it’s not dirt. In fact the molding behind the radiator is ruined and floor beneath is gray, likely from the heat. Somehow, we’ll have to fix this.

9:30 a.m.

Got a call about the delivery of our new appliances. Seems they still had the date of delivery set for this week. So I had to push back the date to January 17th, two weeks after our new kitchen floor will be in.

This causes a new wrinkle. I’ve let the man who is going to install the floor know about this date. He says, “We can see how it goes. Let’s leave it alone for now.”

10:00 a.m.

Since this is an old building, there’s a metal plate in the wall in our living room. Around it are holes in the wall. So the wife of the President of the Board brought in a guy to take out the plate and fix the wall.

Metal Plate in the Wall

The problem is he can’t take out the plate without leaving a gaping hole in our large, brown floorboard. However, he said he will find some kind of solution even though we’ll still have the metal plate.

10:15 a.m.

I was about to drive to the store. But Air Control truck is blocking the garage. Guess I’ll wait.

10:30 a.m.

We’ve been promised we’ll have heat soon.

1:30 p.m. We have heat!

New Boiler!

 

Advertisements

One thought on “Our Heat and its Various Complications

  1. Pingback: Our Heat and its Various Complications | sue powers

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s